Client:
ACA Moltz JV, LLC
Construction period:
2012 - 2014
City/country:
Minturn, Colorado, USA
Contract value:
€ 5 million
Homestake Dam and Reservoir Maintenance and Repair Project, Colorado, USA
Colorado / United States of America
Homestake Dam and Reservoir Maintenance and Repair Project, Asphalt hydraulic engineering, exclusively supply of personnel and machines. The dam is situated at a height of 2,000 - 3,000 m in Colorado/USA.
The works were executed in two construction sections, the first one from 05 to10/2012 and the second one from 05 to10/2013 due to the climatic conditions.