Client: 
Ministry of Transportation Communications and Information Technology

Construction period:
2013 - 2017

City/Country:
Sour/Oman

Contract value:
€  37 million 

Back to Projects

Wadi Minqal & Wadi Bani Jaber Asphalt Road

Oman

The Ministry of Transport and Communications commissioned STRABAG Oman to upgrade existing track roads in Wadi Minqal and Wadi Bani Jaber in the Wilayat Sur. The challenge was that the existing roads had an extreme gradient of up to 25% and led through extreme mountain terrain. The existing track roads were to be realigned and upgraded to asphalt roads. The contract also provided for the construction of drainage systems, the erection of concrete and steel safety barriers and the introduction of traffic signs and road markings. A steel truss arch bridge with a main span of 160 m was also built over the Wadis Addah-Sinaf.

Basic Data:

  • Excavation unsuitable Material: 3.3 million m³
  • Embankment Fill: 1.0 million m³
  • Granular Sub Base & Aggregate Base Course: 60,000 m³
  • Bituminous wearing course 50 mm thick: 10,000 m3
  • Rip-Rap: 60,000 m³
  • Concrete Safety Barrier: 7,400 lin.m
  • Steel Trussed Arch Bridge: 160 lin.m