Client:
Vettenfall Europe Business Service GmbH
Construction period:
2014
City/country:
Goldisthal, Germany
Contract value:
246 k €
PSW Goldisthal - Rehabilitation of lower reservoir, Germany
Germany
The scope comprises the mastic rehabilitation of the lower reservoir of the existing pumped storage plant in Goldisthal.
The following work was to be carried out:
- Slope cleaning: 10,500 m²
- Rehabilitation of damaged areas
- Rehabilitation of cracks at the dam crest road
- Mastic Sealing: 10,500 m²
- Rehabilitation of connecting joint at dam crest road: 300 m
- Rehabilitation of connecting joint to concrete structure: 300 m