Client:
Vettenfall Europe Business Service GmbH

Construction period:
2014

City/country:
Goldisthal, Germany

Contract value:
246 k €

Back to Projects

PSW Goldisthal - Rehabilitation of lower reservoir, Germany

Germany

The scope comprises the mastic rehabilitation of the lower reservoir of the existing pumped storage plant in Goldisthal.

The following work was to be carried out:

  • Slope cleaning: 10,500 m²
  • Rehabilitation of damaged areas
  • Rehabilitation of cracks at the dam crest road
  • Mastic Sealing: 10,500 m²
  • Rehabilitation of connecting joint at dam crest road: 300 m
  • Rehabilitation of connecting joint to concrete structure: 300 m