Client:
Ministry of Defence - Engineering Services
Construction period:
2014 - 2016
City/country:
Adam/Oman
Contract value:
€ 60 million
Construction of Adam Airbase (Package 2)
Oman
The scope of works awarded to STRABAG Oman by The Ministry of Defense included the construction of a parallel taxiway, 2 connecting taxiways from the runway, 7 connecting taxiways to the aprons, a concrete apron, the ground lighting for the airfield, an AGL substation and a high-mast floodlighting system, among other related installations. The contract also provided for the construction of Fighter aircraft hangers, Engine test running pad and Blast deflectors, Aircraft Arrestor Gear & Net Barrier System.
Basic data:
- Earthworks Excavation: 816,850 m³
- Embankment Filling: 334,250 m³
- Aggregate sub base & base course: 113,200 m³
- Cement stabilized aggregates: 45,400 m³
- Bituminous Base Course & Wearing Course: 210,108 t
- Concrete Base Course : 24,800 m³
- RC Concrete Pavement : 29,200 m³
- Airfield Ground Lighting System: (All types) 15,035 Nos
- AGL Primary & Secondary Cables: 130,000 m
- Aircraft Arrestor Gear & Net Barrier System: 2 Set
- High Mast Flood Lights: 14 Nos
- Building Works: 1 Nos
- Fighter Aircraft Sunshade: 5 Nos