Client:
Ministry of Agriculture, Fisheries and Water Resources
Construction period:
2021- 2024
City/Country:
Muscat/Oman
Contract value:
€ 109 million
Construction of Wadi Al-Jifnain Flood Protection (Dam JIF07)
Oman
The Ministry of Agriculture, Fisheries Wealth and Water Resources awarded the contract to STRABAG Oman for the construction of the Wadi Al-Jifnain Flood Protection Dam in Al Khoud in the Muscat Governorate. The flood protection dam, consisting of an earth and rock fill with 20 meter deep concrete sealing wall. The Dam is 6.4 kilometers long and of 22 meters height. The works also included the protection of existing utility lines that crossed the dam's path. Two bottom outlets and two overflow channels.
Basic Data:
- Excavation in Soil: 560,000 m³
- Granular Fill: 2,100,000 m³
- Riprap works: 135,000 m³
- Gabion works: 5,000 m³
- Geotextile works: 6,200 m2
- Plastic Concrete Core: 50,000 m3
- Reinforced Concrete Classes C30 and C40: 110,000 m3
- Reinforcement: 6,400 ton
- Gates (Electrical): 06 Nos
- Diaphragm Wall as Cut-Off Wall: 60,000 m2