Client:
City of Toronto, Canada
Construction period:
2019 - ongoing
City/Country:
Toronto, Canada
Contract value:
€ 80 million
Ashbridges Bay Treatment Plant Integrated Pumping Station – Construction Contract 2
Canada
The Canadian subsidiary of the STRABAG has been awarded the Ashbridges Bay Treatment Plant Integrated Pumping Station – Construction Contract 2 by the City of Toronto to build deep concrete shafts and chambers and feeder tunnels for the new Integrated Pumping Station at Ashbridges Bay Treatment Plant at a cost of almost CAD 120 million, the equivalent of about € 80 million.
The Integrated Pumping Station allows the underground transport of wastewater to the Ashbridges Bay Wastewater Treatment Plant. “The pumping station is part of a larger infrastructure programme aimed at increasing wastewater capacity in the event of heavy rain and so improve the water quality of Toronto’s waterways and Lake Ontario,” explains project manager Simon Köeck.
The main part of the project involves two large-scale shafts: one 68 m deep with a diameter of 27 m and another 27 m deep with a diameter of 32 m. Including five smaller shafts, this results in a total of 153 m of shafts to be built. The shafts will be linked to feeder tunnels with a total length of 445 m, with a rock tunnel section as well as a parallel pressure pipe in an open cut close to the surface.